4.8 Erection of Boiler Auxiliary Machinery
4.8.1 Inspection of main bearings of ball mill.
1 Scope:inspection of main bearings of ball mill.
2 Quality criterias and inspection methods are shown in Table 4.8.1.
Table 4.8.1 Inspection of main bearings of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_423.jpg?sign=1739303087-9oIMPAcEeAhskJEkpIie8wC1WBDxyKXp-0-0d8e32f7e6c28f30dd9e7b6fb00234b6)
Table 4.8.1(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_424.jpg?sign=1739303087-Ara7UQ56XvBKeI6bfDmwC1nsBDi5wcZP-0-0e3b9c9545f2f728f16b6ba85e688b56)
4.8.2 Inspection of large and small gears of ball mill.
1 Scope:inspection of large and small gears of ball mill.
2 Quality criterias and inspection methods are shown in Table 4.8.2.
Table 4.8.2 Inspection of large and small gears of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_425.jpg?sign=1739303087-MzLryeQZ88iOGEms8dp5s2bMP4orCXcL-0-6ef7ed3a1d378c27456c734f8190ddb5)
Table 4.8.2 Inspection of large and small gears of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_426.jpg?sign=1739303087-BaVS12hAfuPqjMgLWDw9ksCWaEDivziC-0-d1430e16b68b9f59fc2221f45b2926c4)
Table 4.8.2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_427.jpg?sign=1739303087-1hxlciEP28E8uPSB5INbNIqrPdFP6Pvn-0-fbdb69b523c4e02079bf8c6325151b1e)
4.8.3 Erection of main bearings of ball mill.
1 Scope:erection of main bearings of ball mill.
2 Quality criteria and inspection methods are shown in Table 4.8.3.
Table 4.8.3 Erection of main bearings of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_428.jpg?sign=1739303087-fNoffgR1gv6sLeAcv7sOdU7vTF4nMqLR-0-42c54db37c39507d006a91adf098831b)
Table 4.8.3(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_429.jpg?sign=1739303087-JQ2nyv0fJEQsFeDOeSenMHKlMftC3t1S-0-f84f704f522ad48fb7a9b36f5d5293ec)
4.8.4 Erection of ball mill body.
1 Scope:erection of ball mill body.
2 Quality criteria and inspection methods are shown in Table 4.8.4.
Table 4.8.4 Erection of ball mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_430.jpg?sign=1739303087-ni6PQaKX72hWIc18y5Ct7Edi9vlfeehL-0-8588c9cc9eae093e0067647a3e697d36)
Table 4.8.4(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_431.jpg?sign=1739303087-oVb5iZnCznklGdLR1IU6c9xvkVneJyxV-0-0fb968886adef7f0cf2d620dce30fadf)
Table 4.8.4(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_432.jpg?sign=1739303087-ZeikQnuSGUhAORXCgSrzthuJwsbwZ84M-0-5cf6e3f47fe1d9313a911159036b1a07)
4.8.5 Erection of transmission devices of ball mill.
1 Scope:erection of ball mill motor,reducer and barring devices.
2 Quality criteria and inspection methods are shown in Table 4.8.5.
Table 4.8.5 Erection of transmission devices of ball mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_433.jpg?sign=1739303087-4jG6T4DipH9KZiBewMAmNCVva8Sv0Fsr-0-9d492264f740a0daaa09a5c5341d08e7)
Table 4.8.5(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_434.jpg?sign=1739303087-RzyG7PpHNjqCZheFcWmBq0PqC7H2pepo-0-33cd37ab6b7bfe951fc8dfbe5a831fdf)
4.8.6 Erection of ball mill oil system.
1 Scope:erection of ball mill oil system.
2 Quality criteria and inspection methods are shown in Table 4.8.6.
Table 4.8.6 Erection of ball mill oil system
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_435.jpg?sign=1739303087-aZwVPZvXAqRXqSCBN1HSWdDKWC0C5N0E-0-79bcddb537c14fff911cf8bcb571fa7c)
Table 4.8.6(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_436.jpg?sign=1739303087-73ZE8rbXZnbseElQVDJtY6kszlWqePtl-0-8c1c189a951cc22735fc0ebfdcd345af)
4.8.7 Certification of hydrostatic tests of oil station cooler,bearing cooling water chamber.
1 Scope:tightness inspection of boiler auxiliary equipment in an oil system.
2 The certification contents are shown in Table 4.8.7.
Table 4.8.7 Certification of hydrostatic tests of oil station cooler,bearing cooling water chamber
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_437.jpg?sign=1739303087-6KrTSMd3aed9ItsGPCZhgYeRCgfhubzm-0-1bbe6f68b6f3694f035a69a5f5a081fc)
4.8.8 Construction record.
1 Scope:erection construction records of whole boiler auxiliary equipments.The specific contents may be filled.
2 The record shall meet the requirements of Table 4.8.8.
Table 4.8.8 Construction record
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_438.jpg?sign=1739303087-NU57eurYMyTtDhXmZNCVRfPYxgiSTMcu-0-c4f522df28cc80118ff8846b1201ab52)
4.8.9 Mill bolts tightening record.
1 Scope:thermal tightening of mill bolts.
2 Record requirements are shown in Table 4.8.9.
Table 4.8.9 Mill bolts tightening record
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_439.jpg?sign=1739303087-78qvovx8elWedE4oVyzBmgUMHFr4ThRd-0-e635a1b3d4117015cdcae49161e1c9fc)
4.8.10 Certification of closing equipment manhole.
1 Scope:closing of manhole door after cleaning of boiler auxiliary equipments and before their trial operation.
2 Certification shall meet the requirements of Table 4.8.10.
Table 4.8.10 certification of closing equipment manhole
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_440.jpg?sign=1739303087-TpAqSvSa7Si9pv32KinxHyiLm5MH6baX-0-8069d6fc149f143d1b69b09cb48b0a97)
4.8.11 Inspection and certification before equipment trial operation.
1 Scope:inspection and certification for all rotary equipments of boiler auxiliary equipments before the trial operation.Inspection items can be added or deleted properly.
2 Certification shall meet the requirements of Table 4.8.11.
Table 4.8.11____________________Inspection and certification before equipment trial operation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_441.jpg?sign=1739303087-Ktf21d2ej8OjnCWLAmO0YGXa8WEuByNt-0-27f2a9440f0c0cf91510f429d9488c60)
4.8.12 Certification of equipment trial operation.
1 Scope:certification of the trial operation of whole boiler auxiliary equipments.
2 Certification shall meet the requirements of Table 4.8.12.
Table 4.8.12 Certification of equipment trial operation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_442.jpg?sign=1739303087-XNsaVqmrLfD1K4DFg1RNmmfc0GuLYy44-0-36bf297ffe769184e64aea442b4187a4)
4.8.13 Erection of fan mill body.
1 Scope:erection of fan mill body.
2 Quality criteria and inspection methods are shown in Table 4.8.1.
Table 4.8.13 Erection of fan mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_443.jpg?sign=1739303087-3SrCi1DaNnuOnbWFkxkqZFoVRx1qSj2y-0-fadaa117ce4f63ffa0b1274b1a8b5870)
Table 4.8.13(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_444.jpg?sign=1739303087-rS8dztvd7XGlLZUbxOzNgIT8iJI3fIhF-0-ecece92daa4a828d0490d8505b62d2e1)
4.8.14 Erection of Fan Mill Oil System.
1 Scope:erection of fan mill oil system.
2 Quality criteria and inspection methods are shown in Table 4.8.14.
Table 4.8.14 Erection of fan mill oil system
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_445.jpg?sign=1739303087-ZF2fv435KYt3Lq8FqUxY9s2hbdyZI3S4-0-05ecfc0d56bd49095e2f7b3577eb7412)
Table 4.8.14(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_446.jpg?sign=1739303087-BLhPoCgUYhDK90uwG1z6CrqeSsvtvYba-0-8b941bd86d37589ac9dd78d093d5bb7c)
4.8.15 Erection of fan mill transmission devices.
1 Scope:erection of fan mill transmission devices.
2 Quality criteria and inspection methods are shown in Table 4.8.15.
Table 4.8.15 Erection of fan mill transmission devices
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_447.jpg?sign=1739303087-WUEOmAJUybUlo4lJX7WASoeK0YJARUhC-0-1c277da24c70f2e090e659b062f31d80)
4.8.16 Erection of MPS(ZGM)medium speed mill body.
1 Scope:erection of MPS(ZGM)medium speed mill body.
2 Quality criterias and inspection methods are shown in Table 4.8.16.
Table 4.8.16 Erection of MPS(ZGM)medium speed mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_448.jpg?sign=1739303087-UvsbNhF9ssXjPPetBMFMGbBLRl5VdZEa-0-80b612eebec6be2d6b9ae29003e7d36a)
Table 4.8.16(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_449.jpg?sign=1739303087-uSeU1EIbqOxcHGpBsO9wUFuHh9fXBXL7-0-4b73b7ea9d061fffc2073a443000a905)
4.8.17 Erection of MPS(ZGM)medium speed mill transmission devices.
1 Scope:erection of medium speed mill transmission devices.
2 Quality criteria and inspection methods are shown in Table 4.8.17.
Table 4.8.17 Erection of MPS(ZGM)medium speed mill transmission devices
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_450.jpg?sign=1739303087-QXVlC3DEQEe0CL4g2cs3mMAQQ6ZsvR0Q-0-3b512fa16f4b9fed7cd04a2fc7460ab6)
4.8.18 Erection of Medium Speed Mill Oil System.
1 Scope:erection of medium speed mill oil system.
2 Quality criteria and inspection methods are shown in Table 4.8.18.
Table 4.8.18 Erection of medium speed mill oil system
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_451.jpg?sign=1739303087-xdk2URHnYjapUx6y35BS3wvL54FTDugv-0-43ee41e3652e5dcaff7e4985aa3bb8b2)
4.8.19 Erection of E-type medium speed coal mill body.
1 Scope:erection of E-type medium speed coal mill body.
2 Quality criteria and inspection methods are shown in Table 4.8.19.
Table 4.8.19 Erection of E-type medium speed coal mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_452.jpg?sign=1739303087-pO1rLIffCZyU7UGuzCXhr3MMH8sob37V-0-979be6d9de33256b292ff4952d577d04)
Table 4.8.19(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_453.jpg?sign=1739303087-gHCxMaY0R5IuQsj7XCqWHv27kBNHOcuA-0-ed61a1ee0e283f0066a3f90c17bcecad)
4.8.20 Erection of E-type medium speed coal mill driving device.
1 Scope:erection of E-type medium speed coal mill driving device.
2 Quality criteria and inspection methods are shown in Table 4.8.20.
Table 4.8.20 Erection of E-type medium speed coal mill driving device
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_454.jpg?sign=1739303087-geuJ17x6n1CCT5LHNB2snStBnmTrskqY-0-9a4ea3698562d352c75143148576f844)
4.8.21 Erection of RP(HP)bowl type coal mill body.
1 Scope:erection of RP(HP)bowl type coal mill body.
2 Quality criterias and inspection methods are shown in Table 4.8.21.
Table 4.8.21 Erection of RP(HP)bowl type coal mill body
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_455.jpg?sign=1739303087-Uz13iohHT53QyPoKoqzav6f3gYUdvDiA-0-2c5be0a9dbf89b058e574ccb27408f6c)
Table 4.8.21(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_456.jpg?sign=1739303087-ELsgJijhIMLAXNzkrJktgBV373sGqKCH-0-caa1eb47e132ecf01ef22ed533e7b64c)
4.8.22 Erection of RP(HP)bowl type coal mill transmission devices.
1 Scope:erection of RP(HP)bowl type coal mill transmission devices.
2 Quality criteria and inspection methods are shown in Table 4.8.22.
Table 4.8.22 Erection of RP(HP)bowl type coal mill transmission devices
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_457.jpg?sign=1739303087-XvrCrS58pVFkEPbt3nRrLYbZbuPuYsMX-0-d5550901429c6c54643846fde93e08f4)
4.8.23 Erection of centrifugal fan.
1 Scope:erection of all centrifugal fans in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.23.
Table 4.8.23 Erection of centrifugal fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_458.jpg?sign=1739303087-WvHxlpSTJdgx5h1X6cFzdaZyWeNNfaK9-0-3e0514f93436147fb8f757d7ae45b032)
Table 4.8.23(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_459.jpg?sign=1739303087-lctcfvF4aJNdrZvgRorEEovRydElBjDH-0-4a45630ef92d5ce96fa9813fe3cdb121)
Table 4.8.23(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_460.jpg?sign=1739303087-mjyn7ahCMmAUGF8UkEI6bkkzhdDUdO7T-0-f4d849b7ee2facfef7351c2467ff2996)
4.8.24 Erection of axial flow fan.
1 Scope:erection of axial flow fans in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.24.
Table 4.8.24 Erection of axial flow fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_461.jpg?sign=1739303087-LISckVnJSLicCJjljKNdbhJ85M2Ms0pz-0-3d87927d9fe67e8b903d702dd1560dbe)
Table 4.8.24(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_462.jpg?sign=1739303087-57S7c7HCq3FnOkYVkwDy1CWlyFeLbt5U-0-75a9530e912ef5ce7d929de922c53299)
4.8.25 Erection of fan motor.
1 Scope:erection of fan motors in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.25.
Table 4.8.25 Erection of fan motor
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_463.jpg?sign=1739303087-Hslx9aNFiRuk4X4BYG8DlpSVGjXDsbb7-0-15fa61033fb7558da0e0da2f001a0056)
4.8.26 Erection of fan oil system.
1 Scope:erection of fans with oil system in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.26.
Table 4.8.26 Erection of fan oil system
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_464.jpg?sign=1739303087-gOyC8cE9jYPTFHY7q0sX88YSQd6cstC6-0-2c5034cdedf7ae4467bd896c62fd6795)
4.8.27 Erection of high pressure fluidization fan.
1 Scope:erection of medium and high pressure fluidization fan in boiler auxiliary machineries.
2 Quality criteria and inspection methods are shown in Table 4.8.27.
Table 4.8.27 Erection of high pressure fluidization fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_465.jpg?sign=1739303087-CJ13LwjMvu3cRIfmqCB4134sdO5MmkVw-0-5c2c3f71c4d82d1918ebffd7b34a6eaa)
Table 4.8.27(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_466.jpg?sign=1739303087-cZZ4lyfLnVUz8MycaYaHqBIEufdeiRJk-0-0dccba54cc86e12160046454f18051b4)
4.8.28 Erection of pulverized coal impeller feeder.
1 Scope:erection of pulverized coal impeller feeder.
2 Quality criteria and inspection methods are shown in Table 4.8.28.
Table 4.8.28 Erection of pulverized coal impeller feeder
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_467.jpg?sign=1739303087-ywjhwhutnI1jpCW9jztmTqNdfUWElvFX-0-f229d9edf7567623021aec79ccf6658a)
4.8.29 Erection of pulverized coal screw conveyer.
1 Scope:erection of such type of pulverized coal screw conveyers.
2 Quality criteria and inspection methods are shown in Table 4.8.29.
Table 4.8.29 Erection of pulverized coal screw conveyer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_468.jpg?sign=1739303087-OGzwbouNCApPqa6O6kzKNiznvFdlY7uN-0-5fc8ebf238918d6eb48ad06fd927f29d)
Table 4.8.29(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_469.jpg?sign=1739303087-jd5urG9Wl0YNXHQRANr6GH5ItJVmmvsJ-0-d9c2077ef4c224ba2b21aae8461121b1)
4.8.30 Erection of pulverized coal scraper conveyer.
1 Scope:erection of such type of coal feeders.
2 Quality criteria and inspection methods are shown in Table 4.8.30.
Table 4.8.30 Erection of pulverized coal scraper conveyer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_470.jpg?sign=1739303087-TD44x6jZ1vasyPcK9HOwmPec2E0rL0YD-0-e5be8bbf287a15b9901a40117ef9de9a)
Table 4.8.30 (continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_471.jpg?sign=1739303087-7kGQihVK9hIb1cnhdnPr1In9tH1iqlpO-0-6f521228226e26c7e32bf1910875e2d8)
4.8.31 Erection of coal vibrating feeder.
1 Scope:erection of such type of coal feeders.
2 Quality criteria and inspection methods are shown in Table 4.8.31.
Table 4.8.31 Erection of coal vibrating Feeder
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_472.jpg?sign=1739303087-mIsdutpvn8MiMeOSghnETHapcXpcfNlF-0-ae5e304d1f64df5ca50ef984a9fde5dd)
4.8.32 Erection of coal belt feeder.
1 Scope:erection of coal belt feeder.
2 Quality criteria and inspection methods are shown in Table 4.8.32.
Table 4.8.32 Erection of coal belt feeder
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_473.jpg?sign=1739303087-umyGjfDB5YgUhKbXdSvqYmzDmjMLiRPB-0-b906521ae5123acff0eaf0755c570afb)
4.8.33 Erection of air compressor.
1 Scope:erection of air compressor.
2 Quality criteria and inspection methods are shown in Table 4.8.33.
Table 4.8.33 Erection of air compressor
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_474.jpg?sign=1739303087-DMGBmhA90oYsZtFPs70P23x3x5Np0OWK-0-c0e5340e8f147c8a4144c78c3d6d0d53)
Table 4.8.33(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_475.jpg?sign=1739303087-kJ6XZ4ScBnaYKMHOjwJYiqqQI3g4HRaH-0-5fe8e40f2df34fe582af257a49f2f6aa)
Table 4.8.33(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_476.jpg?sign=1739303087-xLcESfIMPSgPzBFQa3072YG4BMdoX8ld-0-546c65d62a89b01b9af5fb05e3f8b2a6)
4.8.34 Erection of dryer.
1 Scope:erection of dryers in air compressor room.
2 Quality criteria and inspection methods are shown in Table 4.8.34.
Table 4.8.34 Erection of dryer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_477.jpg?sign=1739303087-TmyUaSBXQwJhUK0rtcDi4NUCxCSZNWqt-0-d3c4400f437d19ea606184fc5aa155b2)
4.8.35 Erection of cooling water pump.
1 Scope:erection of such pumps.
2 Quality criteria and inspection methods are shown in Table 4.8.35.
Table 4.8.35 Erection of cooling water pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_478.jpg?sign=1739303087-Qmp7IOrE40nZTIlaeXRhbF2wQan1gxFw-0-04dd7da9aa8447088b61300d8e68ffab)
Table 4.8.35(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_479.jpg?sign=1739303087-ugfliX1rUdZr1fMKE6glsAdKEs4jdziU-0-e27bff7047ae5ceb8fdef9c8d3c085c1)
4.8.36 Erection of draining pump.
1 Scope:erection of such type of pumps.
2 Quality criteria and inspection methods are shown in Table 4.8.36.
Table 4.8.36 Erection of draining pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_480.jpg?sign=1739303087-XKXVXCmtnBM3WykqEyju9sWLuEna56kz-0-fee2a3275cbc2e7cae47676e3400f403)
Table 4.8.36(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_481.jpg?sign=1739303087-fUcMSRETjZ90O3RmmWw7CohY3ESAS7Tj-0-0e827d60a4dbb098e928146a760b0a40)
4.8.37 Erection of boiler forced circulating Pump.
1 Scope:erection of boiler forced circulating pump.
2 Quality criteria and inspection methods are shown in Table 4.8.37.
Table 4.8.37 Erection of boiler forced circulating pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_482.jpg?sign=1739303087-MERuGgVj09Vbxu7gypnCZf5q5gXATX0U-0-00e0d8b33fc2b8139eb208f52fe78f68)
4.8.38 Erection of start-up circulation pump.
1 Scope:erection of start-up boiler circulation pump.
2 Quality criteria and inspection methods are shown in Table 4.8.38.
Table 4.8.38 Erection of Start-up circulation pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_483.jpg?sign=1739303087-gVlrD8my811NViyIXZ5VPTMCHH0byzCU-0-fed79b14ed743d4c7882447485febb64)
4.8.39 Erection of Emergency Water Feed Pump.
1 Scope:erection of boiler emergency water feed pump.
2 Quality criteria and inspection methods are shown in Table 4.8.39.
Table 4.8.39 Erection of emergency water feed pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_484.jpg?sign=1739303087-eNKsjG4ZwqrrRZMAJyhO6z4iPA29O9Bx-0-9404f2b4e0d59c99211db0c42c1a6e57)
Table 4.8.39(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_485.jpg?sign=1739303087-eRGa8cs30l2BfMLiqiGNkGbBA9TXfn5c-0-8741ec173d79052059904b12f4e9ced4)
4.8.40 Trial operation of pump subsection.
1 Scope:erection of all the pumps at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.40.
Table 4.8.40 Trial operation of pump subsection
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_486.jpg?sign=1739303087-ys3ZNgYPSDYGlQpog7rMNEQEPD0dOmKc-0-00d9c712a0ab22a87f292f6508b74165)
Table 4.8.40(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_487.jpg?sign=1739303087-VCy1Wifbe3xrogteiFoiig4oRKiIjwVw-0-e1dedba4dc2c19789fd424b1d06fb4d0)
4.8.41 Erection of slag extractor.
1 Scope:Table 4.8.41-1 is suitable for the erection of boiler slag extractor;and Table 4.8.41-2 is suitable for the erection of boiler dry slag discharge equipment.
2 Quality criteria and inspection methods are shown in Table 4.8.41-1 and 4.8.41-2.
Table 4.8.41-1 Erection of slag extractor
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_488.jpg?sign=1739303087-IkY6uYKZAiwcDhxEYQXDRqre3VRGqaMH-0-9604627a824c85cfe1c15c5f3114039b)
Table 4.8.41-2 Erection of dry slag slag discharge equipment
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_489.jpg?sign=1739303087-u456mgfHHYvmyaauHtjSZ7IcNFLUXaCK-0-ab8025e0ac95253f0b0268fb2ecd4c1d)
Table 4.8.41-2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_490.jpg?sign=1739303087-BzwdyIhGk28yJTIfbvRA4ecQbtm8KqXg-0-b273fe758b1861a90f0508178790dae2)
Table 4.8.41-2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_491.jpg?sign=1739303087-Hdc1z6SHZmkOwVCmDjmdDY2BxsQcu6x0-0-eb9a030503b55d01561aaede2067b310)
4.8.42 Erection of slag crusher.
1 Scope:erection of boiler slag crusher.
2 Quality criteria and inspection methods are shown in Table 4.8.42.
Table 4.8.42 Erection of slag crusher
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_492.jpg?sign=1739303087-cjFjeAACXNyWu5j0VFMgByHDQoSWlzDe-0-9dd53d8df062064c989d46b7de249d30)
4.8.43 Erection of slag conveyer.
1 Scope:erection of boiler slag conveyer.
2 Quality criterias and inspection methods are shown in Table 4.8.43.
Table 4.8.43 Erection of slag conveyer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_493.jpg?sign=1739303087-rstBQwUdfAaA6Vde461GXv9IJLkU28Pu-0-2a84229f41908c88a9a6f7bcbf19f1fe)
Table 4.8.43(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_494.jpg?sign=1739303087-st8rxvjHwnuHpagroKeULpdUjGDRPrKf-0-7a9b79f29961243c334603ce241ad8f8)
4.8.44 Erection of slurry pump.
1 Scope:erection of boiler slurry pump.
2 Quality criteria and inspection methods are shown in Table 4.8.44.
Table 4.8.44 Erection of slurry pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_495.jpg?sign=1739303087-uxSd1Xjr5qgkotSye1tzyAkFsAbbnsw6-0-1b0d63f92bb133ae5cbd7042adefa288)
Table 4.8.44(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_496.jpg?sign=1739303087-dbjCKCveL1fvPCyFUsBMBt8vwcZG06VX-0-9c0000eebca1c02d2689621354b7ecaf)
4.8.45 Erection of overflow pump.
1 Scope:erection of such type of water pumps.
2 Quality criteria and inspection methods are shown in Table 4.8.45.
Table 4.8.45 Erection of overflow pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_497.jpg?sign=1739303087-Lkm9j0EO9ZXO4DJ6gyhYDXB2MdGmj7iP-0-9313c901d82b5d21b39f543fb1eef8d7)
4.8.46 Erection of flushing pump.
1 Scope:erection of such type of pumps for boiler.
2 Quality criteria and inspection methods are shown in Table 4.8.46.
Table 4.8.46 Erection of flushing pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_498.jpg?sign=1739303087-ge1p1vt68DfqvY1eTFi1aaD64Z7i8r3K-0-eac5409eac23f61b18bcdeccdda72501)
4.8.47 Erection of dredging machine.
1 Scope:erection of dredging machine.
2 Quality criteria and inspection methods are shown in Table 4.8.47.
Table 4.8.47 Erection of dredging machine
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_499.jpg?sign=1739303087-OlKked51mLJCZrwF94H5nYHifdlwyAwW-0-96e739b8a81533e55203083a5a1a9c07)
4.8.48 Erection of gasification fan.
1 Scope:erection of boiler gasification fan.
2 Quality criteria and inspection methods are shown in Table 4.8.48.
Table 4.8.48 Erection of gasification fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_500.jpg?sign=1739303087-jLC0PSeDz3TbE8mIA7VnW9cZ4efLiAOu-0-73b198cbe0a2d4383383ed8e5dc2f672)
4.8.49 Erection of double-axles mixer.
1 Scope:erection of double-axles mixer.
2 Quality criteria and inspection methods are shown in Table 4.8.49.
Table 4.8.49 Erection of double-axles mixer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_501.jpg?sign=1739303087-UQaZszgoCc9Xams8W2q7qg4QDcA5vlNy-0-26544728b0886b2600367e7f3a45a25b)
Table 4.8.49(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_502.jpg?sign=1739303087-q6LUK1ZAthKrlK6K1EqEVBgH4ZYvTqzu-0-1e3a6365c0a7dd3346d0a3efc83bacfd)
4.8.50 Erection of concentrator.
1 Scope:erection of concentrator.
2 Quality criteria and inspection methods are shown in Table 4.8.50.
Table 4.8.50 Erection of concentrator
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_503.jpg?sign=1739303087-fbhnupbwvBH2TsMoTZkITjJIL3PjeVz9-0-a960e1ed30b46140a19c87439c65ea10)
Table 4.8.50(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_504.jpg?sign=1739303087-3iwwlYdBbVLkFURbdQNWMadj7HC0OcqV-0-5afd00ef29ec06ea46de722c0456d03a)
4.8.51 Erection of centrifugal slurry pump.
1 Scope:erection of centrifugal slurry pump.
2 Quality criteria and inspection methods are shown in Table 4.8.51.
Table 4.8.51 Erection of centrifugal slurry pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_505.jpg?sign=1739303087-suIY1bjeLjHmrbZARnixxGeqGpfpQVfb-0-a1ab04cedd97899d29b88ce397f78f64)
Table 4.8.51(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_506.jpg?sign=1739303087-oycsQY5cQ2JuZd2P03YWR7wzgp6x2gjq-0-a0c9d304b57034a8c0fe601ea5169daa)
4.8.52 Erection of water spray plunger slurry pump.
1 Scope:erection of water spray plunger slurry pump.
2 Quality criteria and inspection methods are shown in Table 4.8.52.
Table 4.8.52 Erection of water spray plunger slurry pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_507.jpg?sign=1739303087-CrDxji3f9iwGkvE6xHB7AeOh5fRlv9BC-0-785efde508970e83e68bec0df674d960)
Table 4.8.52(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_508.jpg?sign=1739303087-3zJSmZ9TdncxgJ1eJC9f8YIiJIBGI671-0-bf5e0fd981b01ea1b9aba7bf8731fd5d)
4.8.53 Erection of water-lsolated slurry pump.
1 Scope:erection of centrifugal slurry pump.
2 Quality criteria and inspection methods are shown in Table 4.8.53.
Table 4.8.53 Erection of water-isolated slurry pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_509.jpg?sign=1739303087-iwJDXnf1HgS5vaDPEqpEdDV2ZrY2vaKm-0-bb5b81620e26cbe568245464f28e397a)
4.8.54 Erection of slurry high pressure flushing pump.
1 Scope:erection of slurry high pressure flushing pump.
2 Quality criteria and inspection methods are shown in Table 4.8.54.
Table 4.8.54 Erection of slurry high pressure flushing pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_510.jpg?sign=1739303087-iEsShVIEyaezTckEZoO3Sx1cUp1PaeP3-0-feb27401b0be61297fa45a566b7fc049)
Table 4.8.54(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_511.jpg?sign=1739303087-xwUqAWACi0gTyVMV21FwlzHiURFGtYD1-0-83e791c32e8166f53396771413878953)
4.8.55 Erection of oil-isolated mud pump.
1 Scope:erection of oil-isolated mud pump.
2 Quality criteria and inspection methods are shown in Table 4.8.55.
Table 4.8.55 Erection of oil-isolated mud pump
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_512.jpg?sign=1739303087-kMnemvNrE9zSw9VAHEQaizpWYDoDf2Q4-0-83495206298f5494c4d032ffdf073a9c)
Table 4.8.55(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_513.jpg?sign=1739303087-jS1WTnKY2OC6eYh7nPkBy99hijOBCJZ4-0-9d958bb826a013fc2cf3c4b81b5297c9)
4.8.56 Erection of ash removal pipe-belt conveyer.
1 Scope:erection of ash removal pipe-belt conveyer.
2 Quality criteria and inspection methods are shown in Table 4.8.56.
Table 4.8.56 Erection of ash removal pipe-Belt conveyer
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_514.jpg?sign=1739303087-7stdm3IHDQew0UQe7lsRepQhJ0U3qEb1-0-d371ef9c3f1707384b8495912378b48b)
Table 4.8.56(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_515.jpg?sign=1739303087-0w7XrLSXuSXtCtTlUZFFixQD2pKV9Vl6-0-214b7e74a39f49b1d2abed24a0e6b47e)
Table 4.8.56(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_516.jpg?sign=1739303087-bn2QSggcGbf73gu9brSpK9XtcsLIsszT-0-5abf1168cc855d99bfe977cac7b5aab3)
4.8.57 Erection of roots fan.
1 Scope:erection of roots fan.
2 Quality criteria and inspection methods are shown in Table 4.8.57.
Table 4.8.57 Erection of roots fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_517.jpg?sign=1739303087-XN6rsMw5RjKwTE6iRTCs7bovJKKZOSVB-0-b2f1a59d824181e35bdd313482ced3b2)
Table 4.8.57(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_518.jpg?sign=1739303087-RXEalrx1EneK9n4tnhM3Mm39W65pZ2Fy-0-d30412699d86db16034acd4a2b2539cd)
4.8.58 Maintenance and erection of electric hoist.
1 Scope:erection of all electric hoists at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.58.
Table 4.8.58 Maintenance and erection of electric hoist
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_519.jpg?sign=1739303087-qswhsOGC1KdDDNCGcFcgVJ1Bp0OKzQVv-0-78cb05b88f50d97206191d3241840f17)
Table 4.8.58(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_520.jpg?sign=1739303087-0U2OmrG89oDStwHLBD2jMMjAIP6Xc9zn-0-b45c3c28a3ed34262567d5fbde7d2478)
4.8.59 Electric hoist load test.
1 Scope:load test of all electric hoists at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.59.
Table 4.8.59 Electric Hoist Load Test
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_521.jpg?sign=1739303087-wN9gg7YcHrbRQW3A4xrE2mBvqFZ2wvlK-0-e8164307fab982ddfc1042e679bf27b3)
4.8.60 Erection of rails.
1 Scope:erection of lifting machinery rails at boiler side.
2 Quality criterias and inspection methods are shown in Table 4.8.60.
Table 4.8.60 Erection of rails
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_522.jpg?sign=1739303087-G4c3He01HmtjH4u7HPeHN9S1ZQF9g9Mf-0-82dfa93e459b067773c1bac8041f8165)
Table 4.8.60(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_523.jpg?sign=1739303087-trx6NTSdQ4lwtbYcLd8YXqvgtVfLI0J4-0-4b3668f980d2ab8e6f79b9f8051be70e)
4.8.61 Assembly and erection of crane bridge.
1 Scope:assembly and erection of bridge crane bridge at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.61.
Table 4.8.61 Assembly and erection of crane bridge
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_524.jpg?sign=1739303087-fKgohR4smQCuVKkxyYeIxWicTwk5Ofki-0-b4fd3824ec7226bc2a2f98e6f6bc738b)
Table 4.8.61(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_525.jpg?sign=1739303087-7YlEvLHKcojjOVNUs2rZlkGLOwuVvnyw-0-e83f3d88ad82b8d6739d0c45ed838921)
4.8.62 Maintenance and erection of transmission machinery.
1 Scope:maintenance and erection of lifting machinery transmission devices at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.62.
Table 4.8.62 Maintenance and erection of transmission machinery
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_526.jpg?sign=1739303087-niWG603sMeJ0jLQrHf4HvfdwnnG5MhdY-0-df1567654785b706868632aeaaf31bbb)
4.8.63 Crane no-load/static load test.
1 Scope:no-load/static load test of crane machinery at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.63.
Table 4.8.63 Crane no-load/static load test
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_527.jpg?sign=1739303087-nyBcxreBSwO7Jav7VWw7dD1zoz59zHa3-0-ca29ae91ac90277c37a7eecdd8b274f1)
4.8.64 Crane dynamic load test
1 Scope:dynamic load test of crane at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.64.
Table 4.8.64 Crane dynamic load test
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_528.jpg?sign=1739303087-jO562c1kHyMyDOuOYL61DqaDp23VAqMH-0-734fc72a5dc3df6443e69830e474d763)
4.8.65 Crane live trial operation.
1 Scope:trial operation of live crane machinery at boiler side.
2 Quality criteria and inspection methods are shown in Table 4.8.65.
Table 4.8.65 Crane live trial operation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_529.jpg?sign=1739303087-M0CGvIUhNTbpeVpnMh3FacUUsEiCZl6R-0-202cd8a7ca653ac04c248c8679ca5eee)
Table 4.8.65(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_530.jpg?sign=1739303087-J5TETmV7rqNcAaY0crAnDzWNq5uPXBYK-0-26fd3e0dd9b2159b63c15f4479ef5022)
4.8.66 Mandatory provisions implementation inspection sheet of erection subsection project of coal mill.
1 Scope:mandatory provisions implementation inspection of erection subsection project of coal mill of the boiler auxiliary machineries.
2 Mandatory provisions implementation shall meet the requirements of Table 4.8.66.
Table 4.8.66 Implementation inspection sheet of mandatory provisions of erection subsection project of coal mill
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_531.jpg?sign=1739303087-4gSCNu8TpVNPiwPdkyAX3BXaJhHWyyNX-0-8b57171372e473229574229e546ef3a4)
Table 4.8.66(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_532.jpg?sign=1739303087-4C7TUmqbaqbZb8JJ0e5LoAGMX9JyWMSk-0-45685f0d4c54e1fb01a545f37e455d0e)
4.8.67 Implementation inspection sheet of mandatory provisions of erection subsection project of fan.
1 Scope:mandatory provisions implementation situations inspection of fan erection in the boiler auxiliary machineries.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.67.
Table 4.8.67 Implementation inspection sheet of mandatory provisions of erection subsection project of fan
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_533.jpg?sign=1739303087-mE1WQw1dQsdt5qlNtUMoLIlfXV9IpZlS-0-7a6a36eefeffb563d73052473a0f2021)
4.8.68 Implementation inspection sheet of mandatory provisions of erection subsection project of doal feeder.
1 Scope:mandatory provisions implementation situations inspection of erection subsection project of boiler coal feeder.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.68.
Table 4.8.68 Implementation inspection sheet of mandatory provisions of erection subsection project of coal feeder
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_534.jpg?sign=1739303087-QqZ0LJWf9OJgoaQjE05w8vzK36tXMBM2-0-5b1acc57a722406f0931680bbd0b2225)
4.8.69 Implementation inspection sheet of mandatory provisions of erection subsection project of air compressor.
1 Scope:mandatory provisions implementation situations inspection of erection subsection project of air compressor.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.69.
Table 4.8.69 Implementation inspection sheet of mandatory provisions of erection subsection project of air compressor
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_535.jpg?sign=1739303087-8cVUOAduEKWNW8O9G1b6v2kutlg0bn0a-0-0bf21502b1cff2856022ffc99e9a4bbf)
4.8.70 Mandatory provisions implementation inspection sheet of erection subsection project of pump equipments.
1 Scope:mandatory provisions implementation inspection of erection subsection project of pump equipment in boiler auxiliary machineries.
2 Mandatory provisions implementation shall meet the requirements of Table 4.8.70.
Table 4.8.70 Mandatory provisions implementation inspection sheet of erection subsection project of pump equipments
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_536.jpg?sign=1739303087-aneI80KG37fivXey0jD2mxjSL4KYkc9t-0-39514db795951fd5152b41733847d825)
Table 4.8.70(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_537.jpg?sign=1739303087-1NzBoR9wZK6PgWsOGZRIpz8GK7t6oyYy-0-92ccd38c10f207f3f1ef21e4a0d9d289)
4.8.71 Implementation inspection sheet of mandatory provisions of erection subsection project of ash/slag removal equipment.
1 Scope:mandatory provisions implementation situations inspection of erection subsection project of ash/slag removal equipment in boiler auxiliary machineries.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.71.
Table 4.8.71 Implementation inspection sheet of mandatory provisions of erection subsection project of ash/slag removal equipment
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_538.jpg?sign=1739303087-j4sevHfXbp86N3T8AZ8RKi0oO82rcLcl-0-6f6e8e137d7d63663bb63876c7218e70)
Table 4.8.71(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_539.jpg?sign=1739303087-199wPggoB6MqXxNdfmsiu3gmfVRI3VVy-0-442583ea22c2c7c1a584cfe804054ed5)
4.8.72 Implementation inspection sheet of mandatory provisions of erection subsection project of lifting facilities in boiler room.
1 Scope:mandatory provisions implementation situations inspection of erection subsection project of lifting facilities in boiler room.
2 Mandatory provisions implementation situations shall meet the requirements of Table 4.8.72.
Table 4.8.72 Implementation inspection sheet of mandatory provisions of erection subsection project of lifting facilities in boiler room
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_540.jpg?sign=1739303087-YsgPRVxd94BfppN5jLfcQU5n7CuADXZY-0-a187ecb12d1cf914d0794dd0973b1076)
Table 4.8.72(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_541.jpg?sign=1739303087-6S7CwylkqC9Hi0vc5YLOlDUduxej38V9-0-6e8d9ce83e5a3177c457b4753a53d376)